Pitt River Bridge – Pitt Meadows Farming Country loop from Port Coquitlam
Pitt River Bridge – Pitt Meadows Farming Country loop from Port Coquitlam
43
riders
04:00
84.6km
510m
Road cycling
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: July 27, 2026
Tips
Includes a segment in which cycling is not permitted
After 37.2 km for 226 m
Waypoints
Start point
Train Station
Get Directions
4.91 km
Highlight • Bridge
Tip by
5.51 km
Highlight (Segment) • Cycleway
Tip by
37.3 km
Highlight • Rest Area
Tip by
38.0 km
Highlight (Segment) • Trail
Tip by
48.2 km
South Beach
Beach
67.8 km
Highlight • Cycleway
Tip by
71.3 km
Highlight • River
84.6 km
End point
Train Station
Way Types & Surfaces
Way Types
54.6 km
23.4 km
2.48 km
1.97 km
1.83 km
370 m
< 100 m
Surfaces
78.7 km
3.26 km
1.79 km
560 m
339 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (200 m)
Lowest point (0 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Tuesday 28 July
22°C
15°C
80 %
Additional weather tips
Max wind speed: 14.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free