Bridgwater and Taunton Canal – Swing Bridge Across the Canal loop from Creech St Michael
Bridgwater and Taunton Canal – Swing Bridge Across the Canal loop from Creech St Michael
86
runners
00:57
9.20km
10m
Running
Moderate run. Good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: October 27, 2026
Tips
Includes a movable bridge
Check opening times.
After 2.22 km for 10 m
Waypoints
Start point
Bus stop
2.11 km
Highlight • River
Tip by
2.22 km
Highlight • River
Tip by
3.13 km
Highlight • Structure
Tip by
7.90 km
Highlight (Segment) • Natural
9.20 km
End point
Bus stop
Way Types & Surfaces
Way Types
4.53 km
4.48 km
155 m
< 100 m
Surfaces
4.19 km
3.77 km
1.19 km
< 100 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Sunday 8 November
11°C
4°C
0 %
Additional weather tips
Max wind speed: 4.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.