RoutesPlannerFeaturesUpdates
App
Login or Signup
Get the App
Login or Signup
Routes
United States
Massachusetts
Worcester County
Rutland

Mass Central Rail Trail – Thayer Pond WMA loop from Rutland

Routes
United States
Massachusetts
Worcester County
Rutland

Mass Central Rail Trail – Thayer Pond WMA loop from Rutland

Moderate

4.7

(1921)

12,465

riders

Mass Central Rail Trail – Thayer Pond WMA loop from Rutland

02:24

33.4km

260m

Gravel riding

Moderate gravel ride. Good fitness required. Mostly paved surfaces. The starting point of the route is right next to a parking lot.

Last updated: November 5, 2026

Tips

Your route passes through protected areas

Please check local regulations for:

Rutland State Park

Ware River Watershed

Waypoints

A

Start point

Parking

Get Directions
1

392 m

Thayer Pond

Highlight • Lake

Thayer Pond is a pretty big body of water for a pond, and it's just off the side of the Mass Central Rail Trail. You get good views of the water through the trees, and there are a couple of clearings with open views of the pond.

Tip by

2

1.04 km

Thayer Pond WMA is a 131-acre outdoor playground with the Central Mass Rail Trail running through it. You can enjoy wildlife viewing, hunting, and fishing in this natural landscape. The eastern part of the preserve is home to Thayer Pond, while the western part has a mixed hardwood forest with gray foxes and squirrels. Mill Brook flows through it, where you can spot several beaver impoundments along its banks.

Tip by

3

1.06 km

Mass Central Rail Trail

Highlight (Segment) • Cycleway

The Mass Central Rail Trail is a 59-mile paved trail that is planned to extend to 104 miles from Boston to Northampton.

Tip by

4

3.58 km

Rutland State Park

Highlight • Forest

Rutland State Park is a 300-acre state park that is home to Whitehall Pond and multiple hiking and biking trails.

Tip by

5

10.4 km

Ware River Diversion Dam

Highlight • Monument

The Ware River Diversion Dam helps control the flow of water from the Quabbin Aqueduct into the Ware River. This is a really cool looking structure that you can see from the side of the trail.

Tip by

6

10.5 km

The Massachusetts Central Rail Trail is a long term project to create the longest multi-use path in New England. It was once a railroad, but it was put out of action after being severely damaged by storms in 1938. Once completed, it will be 104 miles in length, connecting Boston with Northampton.

Tip by

11.1 km

Ware river

Lake

8

23.1 km

East Branch Ware River

Highlight • River

The Ware River is a 35.4-mile river with two forks; the West Fork that starts in Hubbardston and the East Branch that starts in Westminster.

Tip by

9

32.4 km

Thayer Pond WMA

Highlight • Lake

Thayer Pond WMA is a 131-acre outdoor playground with the Central Mass Rail Trail running through it. You can enjoy wildlife viewing, hunting, and fishing in this natural landscape. The eastern part of the preserve is home to Thayer Pond, while the western part has a mixed hardwood forest with gray foxes and squirrels. Mill Brook flows through it, where you can spot several beaver impoundments along its banks.

Tip by

B

33.4 km

End point

Parking

Loading

Way Types & Surfaces

Way Types

11.9 km

11.2 km

6.18 km

2.88 km

972 m

276 m

Surfaces

25.9 km

5.92 km

1.47 km

190 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation
Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (320 m)

Lowest point (200 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Monday 9 November

12°C

4°C

39 %

Additional weather tips

There’s a fairly high chance of rain. Consider packing a waterproof jacket.

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save
Edit route
Download GPX
Move start point
Print
Share
Embed on a website
Report an Issue
Report restricted access

Nearby routes

Moderate

4.5

16

Mass Central Rail Trail – Thayer Pond WMA loop from Conservation Land

01:43h

26.7km

160m

Explore
RoutesRoute plannerFeaturesRedeem a voucherHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy