Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Road cycling routes
Poland
powiat kołobrzeski
gmina Kołobrzeg

Bridge Over the Drzewny Canal – Port Bridge Kołobrzeg loop from Głowaczewo

Routes
Road cycling routes
Poland
powiat kołobrzeski
gmina Kołobrzeg

Bridge Over the Drzewny Canal – Port Bridge Kołobrzeg loop from Głowaczewo

Moderate

5.0

(1)

20

riders

Bridge Over the Drzewny Canal – Port Bridge Kołobrzeg loop from Głowaczewo

01:50

40.1km

90m

Road cycling

Moderate road ride. Great for any fitness level. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.

Last updated: July 23, 2026

Tips

Includes a segment in which cycling is not permitted

After 13.0 km for 161 m

Waypoints

A

Start point

Bus stop

Get Directions

1

12.5 km

Kołobrzeg Stadion Railway Platform

Highlight • Rest Area

Railway station platform at the Kotwica Kołobrzeg stadium.
If someone wants to go straight west from Kołobrzeg, it is better to get off here than at the main station

Translated by Google •

Tip by

2

12.9 km

Bridge Over the Drzewny Canal

Highlight • Bridge

The Drzewny Canal is a three-kilometer long river branch of the Parsęta, starting in Budzistowo and running through Kołobrzeg to the sea port, where it joins the waters of the Parsęta.

Translated by Google •

Tip by

3

13.1 km

Parsęta River

Highlight • River

In the Persante you can relax particularly well. The population here is very large.

Translated by Google •

Tip by

4

13.9 km

The bridge over the Parsęta River on Łopuskiego Street in Kołobrzeg is an interesting example of historic technical infrastructure. It was built in 1900 as a riveted steel bridge, supported by stone or reinforced concrete abutments and a pillar in the river. After renovation in 2015, it retained its historic character. Next to the road part, on the same supports, there is also a steel technical structure with a designated bicycle path, separated from cars.

Translated by Google •

Tip by

5

14.7 km

Nice little marina ⛵

Translated by Google •

Tip by

6

15.0 km

Port Bridge Kołobrzeg

Highlight • Bridge

An elegant high bridge.

Translated by Google •

Tip by

7

17.9 km

Therefore, to use with caution at peak times very busy. Otherwise in good condition.

Translated by Google •

Tip by

8

38.5 km

Monument to St. Florian

Highlight • Monument

An interesting statue of St. Florian here in front of the fire station, along with a commemorative plaque for firefighters. Unusual. The statue of St. Florian is very beautiful.

Translated by Google •

Tip by

B

40.1 km

End point

Bus stop

Loading

Way Types & Surfaces

Way Types

20.2 km

9.87 km

4.96 km

4.93 km

106 m

< 100 m

Surfaces

22.6 km

9.71 km

7.41 km

400 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Monday 27 July

21°C

16°C

0 %

Additional weather tips

Max wind speed: 27.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Moderate

4.6

400

Bridge Over the Drzewny Canal – Ekopark Wschodni Nature Trail loop from Kołobrzeg Stadion

03:24h

75.8km

120m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy