Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Road cycling routes
Poland
Masovian Voivodeship
Wołomin
Zielonka

Żerań Footbridge – View of Warsaw Skyline loop from Zielonka

Routes
Road cycling routes
Poland
Masovian Voivodeship
Wołomin
Zielonka

Żerań Footbridge – View of Warsaw Skyline loop from Zielonka

Moderate

5.0

(4)

82

riders

Żerań Footbridge – View of Warsaw Skyline loop from Zielonka

02:16

54.7km

150m

Road cycling

Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.

Last updated: May 17, 2026

Tips

Temporary access restrictions

Includes segments with temporary access restrictions.

After 30.1 km for 72 m

Customers only

Waypoints

A

Start point

Train Station

Get Directions

1

11.5 km

Warszawa Toruńska – and there are about 40 of those wagons!

Highlight • Structure

Sometimes the train will rumble.

Translated by Google •

Tip by

2

13.3 km

The Gen. Stefan Grot-Rowecki Bridge in Warsaw, formerly Toruński Bridge, was built in 1977–1981 as part of the Toruńska Route. It is 645 m long and consists of two structurally independent parts, each with five lanes. The reconstruction of the bridge to the parameters of the S8 expressway lasted from 2013 to 2015. The bridge is one of the largest in Warsaw and is a key element of the city's expressway bypass. In 2015, one dismantled bridge bearing was sent to the Pontiseum at the Road and Bridge Research Institute.

Translated by Google •

Tip by

3

15.3 km

Żerań Footbridge

Highlight • Bridge

The Żerań Footbridge, opened in 2016, proved to be a success, quickly becoming a popular cycling route. The bridge behind the Żerań CHP plant enabled the continuation of the cycling route on the right bank of the Vistula, which was created as a result of many years of effort, which began in 2002. The footbridge is a key element of the 17.5 km cycling section, which connects the Łazienkowski and Grota bridges with the northern border of Warsaw. The project was implemented after the bridge was adapted to a pedestrian and bicycle path, which significantly facilitated cycling in this part of the city.

Translated by Google •

Tip by

4

15.9 km

Bend by the Barrier

Highlight • Cycleway

5

18.2 km

Maria Sklodowska-Curie Bridge

Highlight (Segment) • Bridge

Bridge over the Vistula River below it because both sides of the great bike paths along the river.

Translated by Google •

Tip by

6

28.6 km

(PL)
The idea of ​​building a pedestrian and bicycle bridge over the Vistula River has been around for years. In 2016, the investment budget was included in the multi-annual investment plan of Warsaw. When choosing the location, two concepts were mainly taken into account: at the height of Karowa Street or at the height of Ratuszowa Street. Ultimately, the choice fell on the first one. This is another concept for locating the Vistula crossing in this place. The design competition was won by DKFS Architects and Schüßler-Plan. The length of the crossing is 452 meters. The crossing was opened on March 28, 2024

(EN)
The idea of ​​building a pedestrian and bicycle bridge over the Vistula River has been around for years. In 2016, the investment budget was included in the multi-annual investment plan of Warsaw. When choosing the location, two concepts were mainly taken into account: at the height of Karowa Street or at the height of Ratuszowa Street. Ultimately, the choice fell on the first one. This is another concept for locating the Vistula crossing in this place. The design competition was won by DKFS Architects and Schüßler-Plan. The length of the crossing is 452 meters. The crossing was opened on March 28, 2024

Sources:
pl.wikipedia.org/wiki/K%C5%82adka_na_Wi%C5%9Ble_w_Warszawie
schuessler-plan.de/pl/projekty/most-karowa-warszawa.html
plankton.group

mostnaprage.waw.pl

Translated by Google •

Tip by

7

30.3 km

Climb on Tamka Street

Highlight (Segment) • Climb

A short, 600-meter climb along Tamka Street in Warsaw, up to the intersection of Świętokrzyska and Nowy Świat. Average gradient 4.1%, elevation gain 20 m. There is a bike path on the asphalt.

Translated by Google •

Tip by

8

39.8 km

Siekierkowski Bridge with panorama

Highlight • Viewpoint

In order to enjoy the view of the city, you need to choose the bikepath on the northern side of the bridge.

Tip by

B

54.7 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

36.1 km

12.7 km

5.00 km

394 m

302 m

101 m

Surfaces

43.4 km

6.41 km

4.73 km

< 100 m

< 100 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Saturday 6 June

24°C

12°C

42 %

Additional weather tips

Max wind speed: 11.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Nearby routes

Moderate

4.8

1,628

Góra Café – Gassy Road loop from Natolin

02:45h

70.8km

180m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy