Bowling Railway Bridge – Stone Tunnel Entrance loop from Dumbarton East
Bowling Railway Bridge – Stone Tunnel Entrance loop from Dumbarton East
25
runners
01:07
10.9km
40m
Running
Moderate run. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 18, 2026
Waypoints
Start point
Train Station
Get Directions
6 m
Highlight • Structure
Translated by Google •
Tip by
4.90 km
Highlight • Bridge
Tip by
5.39 km
Highlight • Bridge
10.9 km
End point
Train Station
Way Types & Surfaces
Way Types
8.81 km
1.09 km
929 m
< 100 m
Surfaces
7.33 km
3.34 km
142 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Monday 1 June
18°C
12°C
75 %
Additional weather tips
Max wind speed: 18.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.