Valley Green Inn – Manayunk Bridge Trailhead loop from Chestnut Hill East
Valley Green Inn – Manayunk Bridge Trailhead loop from Chestnut Hill East
3.1
(11)
71
riders
01:59
30.2km
290m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: July 20, 2026
Tips
Includes a segment in which cycling is not permitted
After 8.40 km for 51 m
Waypoints
Start point
Train Station
5.30 km
Highlight • Restaurant
Tip by
8.42 km
Highlight • Bridge
Tip by
10.0 km
Highlight • Monument
Tip by
10.0 km
Highlight (Segment) • Trail
Tip by
12.1 km
Highlight • Bridge
Tip by
15.1 km
Highlight • Trail
Tip by
30.2 km
End point
Train Station
Way Types & Surfaces
Way Types
16.7 km
8.78 km
1.90 km
1.44 km
1.29 km
< 100 m
< 100 m
Surfaces
16.6 km
11.9 km
1.07 km
555 m
115 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (130 m)
Lowest point (10 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Friday 9 October
22°C
8°C
0 %
Additional weather tips
Max wind speed: 13.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
4.8
138
View from Sullivan's Bridge – Schuylkill River Trail loop from Audubon
02:59h
50.4km
160m
4.7
283
Turtle Rock Light – Schuylkill Banks Boardwalk loop from Ellsworth-Federal
01:46h
29.9km
130m
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.