Tilden Park Steam Train – Grizzly Peak Boulevard loop from Rockridge
Tilden Park Steam Train – Grizzly Peak Boulevard loop from Rockridge
4.7
(4790)
5,254
riders
02:01
28.8km
620m
Gravel riding
Hard gravel ride. Very good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: October 28, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions.
After 12.7 km for 942 m
Open: • April 1-November 1 (otherwise closed)
Waypoints
Start point
Train Station
2.36 km
Highlight • Historical Site
Tip by
10.9 km
Highlight (Segment) • Trail
Tip by
14.2 km
Highlight • Structure
Tip by
14.8 km
Highlight (Segment) • Viewpoint
Tip by
20.2 km
Highlight • Rest Area
Tip by
20.6 km
Highlight • Viewpoint
Tip by
22.4 km
Highlight (Segment) • Climb
Tip by
28.8 km
End point
Train Station
Way Types & Surfaces
Way Types
9.83 km
9.40 km
7.68 km
1.51 km
267 m
162 m
< 100 m
Surfaces
19.2 km
4.14 km
3.53 km
1.36 km
664 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Thursday 12 November
22°C
12°C
0 %
Additional weather tips
Expect light wind and shifting conditions.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.