RoutesPlannerFeaturesUpdates
App
Login or Signup
Get the App
Login or Signup
Routes
United States
New Hampshire
Hillsborough County
Manchester

Goffstown Rail Trail – Victory Park loop from Manchester

Routes
United States
New Hampshire
Hillsborough County
Manchester

Goffstown Rail Trail – Victory Park loop from Manchester

Moderate

4.9

(2838)

15,616

riders

Goffstown Rail Trail – Victory Park loop from Manchester

03:07

45.2km

230m

Gravel riding

Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.

Last updated: October 8, 2026

Waypoints

A

Start point

Bus stop

Get Directions
1

8.57 km

Hillsborough County Poor Farm Cemetery

Highlight • Historical Site

Cemetery from the 19th century, poor farm on this location. Graves marked just with numbers.

Tip by

2

11.8 km

Goffstown Rail Trail

Highlight (Segment) • Trail

The Goffstown Rail Trail is a 5.5 mile multiuse trail. It is mostly packed dirt.

At times the path will cross some roads with car traffic, so it is important to be cautious while crossing.

Tip by

3

14.4 km

Goffstown Town center

Highlight • Settlement

This is a very quaint town center that doesn't go in to being touristy. Very charming to pass through

Tip by

21.0 km

Piscataquog River Greenbelt

Forest

5

30.5 km

Goffstown Rail Trail

Highlight (Segment) • Trail

The Goffstown Rail Trail is a 5.5 mile multiuse trail. It is mostly packed dirt.

At times, the path will cross some roads with car traffic, so it is important to be cautious while crossing.

Tip by

6

38.7 km

Kelley Dam Falls

Highlight • Waterfall

Nice view onto a small waterfall that was created by the Kelley Dam on the Piscataquog River.

The dam was constructed in 1916 and is still used by the Kelley’s Falls Hydroelectric Project.

Tip by

7

39.3 km

Bridge Over Piscataquog River

Highlight (Segment) • Bridge

8

39.4 km

Bridge over Piscataquog River

Highlight • Bridge

Pedestrian bridge over the Piscataquog River. The bridge is used as a connector between the east and west sections of the Piscataquog River Trail.

Tip by

40.0 km

Piscataquog River

Lake

10

44.4 km

Victory Park

Highlight • Rest Area

B

45.2 km

End point

Bus stop

Loading

Way Types & Surfaces

Way Types

26.9 km

8.24 km

6.26 km

2.65 km

491 m

401 m

380 m

Surfaces

22.2 km

21.4 km

969 m

514 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation
Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (100 m)

Lowest point (40 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Friday 9 October

20°C

6°C

0 %

Additional weather tips

Max wind speed: 25.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save
Edit route
Download GPX
Move start point
Print
Share
Embed on a website
Report an Issue
Report restricted access

Nearby routes

Hard

15

Kelley Dam Falls – Goffstown Rail Trail loop from Beech Hill / Townhomes (EB)

04:07h

58.6km

410m

Explore
RoutesRoute plannerFeaturesRedeem a voucherHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy