Bridge on Chudoby Street – Footbridge over the Żerański Canal loop from Ząbki
Bridge on Chudoby Street – Footbridge over the Żerański Canal loop from Ząbki
5.0
(1)
8
riders
02:57
53.1km
110m
Mountain biking
Moderate mountain bike ride. Good fitness required. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: September 25, 2026
Tips
Cycling is not permitted along parts of this route
After 12.1 km for 176 m
After 21.2 km for 72 m
After 24.5 km for 67 m
Waypoints
Start point
Train Station
6.42 km
Highlight • Bridge
Translated by Google •
Tip by
21.3 km
Highlight • Bridge
Translated by Google •
Tip by
22.5 km
Highlight • Bridge
Translated by Google •
Tip by
24.5 km
Highlight • Structure
Translated by Google •
Tip by
25.0 km
Highlight • Lake
Translated by Google •
Tip by
25.5 km
Highlight • Bridge
Translated by Google •
Tip by
50.1 km
Highlight • Bridge
Tip by
53.1 km
End point
Train Station
Way Types & Surfaces
Way Types
22.8 km
13.9 km
9.83 km
5.10 km
1.45 km
< 100 m
Surfaces
39.8 km
5.66 km
4.44 km
1.77 km
793 m
638 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Tuesday 6 October
22°C
7°C
0 %
Additional weather tips
Max wind speed: 10.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.