Church of the Holy Spirit – Bridge Over the Bug River loop from Niemirów
Church of the Holy Spirit – Bridge Over the Bug River loop from Niemirów
11
riders
02:59
75.6km
320m
Road cycling
Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The route includes a crossing by ferry. The starting point of the route is right next to a parking lot.
Last updated: May 22, 2026
This route includes a ferry crossing
Tips
Temporary access restrictions
Includes segments with temporary access restrictions. Check ahead to confirm restricted segments are open to the public.
After 65.8 km for 90 m
Waypoints
Start point
Parking
Get Directions
11.3 km
Highlight • Religious Site
Translated by Google •
Tip by
11.6 km
Highlight • Structure
Translated by Google •
Tip by
12.1 km
Highlight • Structure
Translated by Google •
Tip by
18.0 km
Highlight (Segment) • Trail
Translated by Google •
Tip by
30.7 km
Highlight • Bridge
Translated by Google •
Tip by
53.7 km
Highlight • Structure
Translated by Google •
Tip by
54.5 km
Highlight • Restaurant
Translated by Google •
Tip by
65.5 km
Highlight • Historical Site
Translated by Google •
Tip by
75.6 km
End point
Parking
Way Types & Surfaces
Way Types
65.6 km
4.69 km
4.24 km
1.10 km
< 100 m
Surfaces
74.7 km
418 m
341 m
199 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Saturday 1 August
28°C
18°C
14 %
Additional weather tips
Max wind speed: 13.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free