Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Login or Signup

Routes
Road cycling routes
United States
Michigan
Washtenaw County
Ann Arbor

Argo Dam Railway Bridge – Parker Mill County Park loop from Molin Nature Area

Routes
Road cycling routes
United States
Michigan
Washtenaw County
Ann Arbor

Argo Dam Railway Bridge – Parker Mill County Park loop from Molin Nature Area

Moderate

4.7

(1213)

18,444

riders

Argo Dam Railway Bridge – Parker Mill County Park loop from Molin Nature Area

01:34

28.9km

160m

Road cycling

Moderate road ride. Great for any fitness level. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.

Last updated: May 12, 2026

Tips

The surface for a segment of your route may not be suitable

Some segments of your route comprise a surface that may not be suitable for your chosen sport.

After 8.57 km for 257 m

Waypoints

A

Start point

Bus stop

Get Directions

1

6.43 km

Argo Dam Railway Bridge

Highlight • Bridge

Here is an up close view of Argo Dam. It's located about 50.5 miles upstream from the Huron River's mouth at Lake Erie. Great place to hop off your bike for a rest!

Tip by

2

6.69 km

Broadway Park Bridge

Highlight • Bridge

New park next to the cascades connected by a big bridge. New construction still underway.

Tip by

3

8.92 km

Fuller Park

Highlight • Rest Area

Nice area to hang out

Tip by

4

12.4 km

Gallup Park

Highlight • Rest Area

Gallup Park spans 69 acres along Ann Arbor's Huron River and Geddes Pond. Scenic walkways loop around small islands and bridges. Some of the park's highlights are canoe, kayak, and …

Tip by

5

13.6 km

South Pond

Highlight • Lake

South Pond has an intriguing environmental history. What is now a pond surrounded by wetlands was originally prairie terrain before the construction of the Dixboro Dam flooded the area, turning …

Tip by

6

15.5 km

Parker Mill County Park

Highlight • Historical Site

Nice activity stop on the B2B with a connection to the botanical gardens to the north

Tip by

7

15.6 km

Parker Mill and Fleming Sawmill

Highlight • Historical Site

The Parker Mill, also known as Parker Mill Park or Parker Mill Complex, is a mill located at 4650 Geddes Road, east of Ann Arbor, Michigan. The mill is a …

Translated by Google •

Tip by

8

22.4 km

Gallup Youth Fishing Pond

Highlight • Lake

Three Ann Arbor parks have been designated as wildlife sanctuary areas with limits placed on permitted activities there by City Council. The designations were given to Gallup Park, across the …

Tip by

B

28.9 km

End point

Bus stop

Loading

Way Types & Surfaces

Way Types

21.6 km

5.01 km

1.48 km

571 m

243 m

< 100 m

Surfaces

18.6 km

9.02 km

1.03 km

196 m

146 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (280 m)

Lowest point (230 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Saturday 23 May

13°C

12°C

-- %

Additional weather tips

Max wind speed: -- km/h

to get more detailed weather forecasts along your route

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Nearby routes

Moderate

4.2

169

Delhi Bridge – Argo Dam Railway Bridge loop from Ann Arbor

01:36h

37.2km

210m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy