Fuji Subaru Line Toll Gate – Mount Fuji 5th Station loop from Fuji Hokuroku Stadium
Fuji Subaru Line Toll Gate – Mount Fuji 5th Station loop from Fuji Hokuroku Stadium
515
riders
02:54
48.5km
1,270m
Road cycling
Hard road ride. Very good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: February 28, 2026
Tips
Your route passes through a protected area
Please check local regulations for:
富士箱根伊豆国立公園
Waypoints
Start point
Bus stop
Get Directions
581 m
Highlight • Rest Area
Translated by Google •
Tip by
24.2 km
Highlight • Rest Area
Translated by Google •
Tip by
31.1 km
Highlight • Parking
Tip by
48.5 km
End point
Bus stop
Way Types & Surfaces
Way Types
48.4 km
< 100 m
< 100 m
Surfaces
48.4 km
< 100 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Monday 1 June
17°C
12°C
88 %
Additional weather tips
Max wind speed: 2.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.