Allenjoie lock intersection – Bridge over the Allan loop from Montbéliard
Allenjoie lock intersection – Bridge over the Allan loop from Montbéliard
4.7
(11)
135
riders
01:19
29.7km
130m
Road cycling
Moderate road ride. Great for any fitness level. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: October 8, 2026
Tips
Includes a segment in which cycling is not permitted
After 19.6 km for 56 m
Waypoints
Start point
Train Station
14.8 km
Highlight • Monument
19.2 km
Highlight • Other
Translated by Google •
Tip by
19.4 km
Highlight • River
Translated by Google •
Tip by
19.4 km
Highlight • Rest Area
Translated by Google •
Tip by
26.6 km
Highlight • Other
Translated by Google •
Tip by
29.6 km
Highlight • Other
Translated by Google •
Tip by
29.7 km
Highlight • Settlement
Translated by Google •
Tip by
29.7 km
End point
Train Station
Way Types & Surfaces
Way Types
20.9 km
5.81 km
1.07 km
942 m
370 m
346 m
264 m
Surfaces
27.4 km
1.00 km
910 m
403 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (400 m)
Lowest point (320 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Sunday 11 October
18°C
2°C
0 %
Additional weather tips
Max wind speed: 13.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Quick lunch, & given the nice weather we got the bikes out and headed off along the cycle …
Want to know more?
Sign up for a free komoot account to join the conversation.