Findhorn Bridge – Tomatin Viaduct loop from Dumnaglass Road End
Findhorn Bridge – Tomatin Viaduct loop from Dumnaglass Road End
66
riders
03:11
66.0km
570m
Road cycling
Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: October 15, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions.
After 31.0 km for 70 m
Customers only
Waypoints
Start point
Bus stop
12.2 km
Highlight • Forest
Tip by
24.4 km
Highlight • Viewpoint
29.9 km
Highlight • Monument
Tip by
31.0 km
Highlight • River
31.4 km
Highlight • Historical Site
Translated by Google •
Tip by
35.1 km
Highlight • Trail
66.0 km
End point
Bus stop
Way Types & Surfaces
Way Types
61.6 km
2.30 km
1.31 km
691 m
115 m
< 100 m
Surfaces
51.7 km
13.7 km
690 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (470 m)
Lowest point (160 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Thursday 12 November
6°C
2°C
14 %
Additional weather tips
Expect light wind and shifting conditions.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.