Wedgewood Ravine Pathway – Anthony Henday Footbridge loop from Riverbend
Wedgewood Ravine Pathway – Anthony Henday Footbridge loop from Riverbend
9
riders
01:51
29.0km
260m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 10, 2026
Tips
Cycling is not permitted along parts of this route
After 11.7 km for 127 m
After 25.9 km for 71 m
Waypoints
Start point
Bus stop
Get Directions
9.83 km
Highlight • Gorge
Tip by
11.8 km
Highlight • Rest Area
Tip by
13.5 km
Highlight • Natural
Tip by
16.2 km
Highlight • Cycleway
Tip by
19.9 km
Highlight • Bridge
Tip by
26.8 km
Highlight • Rest Area
Tip by
29.0 km
End point
Bus stop
Way Types & Surfaces
Way Types
20.7 km
4.35 km
2.47 km
1.38 km
< 100 m
Surfaces
21.0 km
6.58 km
966 m
262 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (700 m)
Lowest point (630 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Sunday 24 May
20°C
9°C
0 %
Additional weather tips
Max wind speed: 19.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.