ŻEBROK Pond – Footbridge over the tracks in BIERUŃ loop from Oświęcim
ŻEBROK Pond – Footbridge over the tracks in BIERUŃ loop from Oświęcim
8
riders
02:51
51.8km
150m
Gravel riding
Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 23, 2026
Tips
Cycling is not permitted along parts of this route
After 0 m for 200 m
After 47.1 km for 59 m
After 51.7 km for 207 m
Waypoints
Start point
Train Station
Get Directions
2.57 km
Highlight • Historical Site
Translated by Google •
Tip by
7.46 km
Highlight • Bridge
Translated by Google •
Tip by
20.8 km
Highlight • Lake
22.1 km
Highlight • Trail
Translated by Google •
Tip by
28.1 km
Highlight • Religious Site
Translated by Google •
Tip by
36.3 km
Highlight • Bridge
Translated by Google •
Tip by
36.6 km
Highlight • Rest Area
Translated by Google •
Tip by
36.7 km
Highlight • Religious Site
Translated by Google •
Tip by
51.8 km
End point
Train Station
Way Types & Surfaces
Way Types
18.0 km
16.7 km
10.4 km
6.19 km
268 m
162 m
< 100 m
Surfaces
19.5 km
18.4 km
6.57 km
6.12 km
726 m
453 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Sunday 24 May
26°C
15°C
0 %
Additional weather tips
Max wind speed: 12.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.