Crossener Gate – Railway Viaduct loop from Sulechów
Crossener Gate – Railway Viaduct loop from Sulechów
5.0
(1)
7
riders
01:54
32.1km
200m
Gravel riding
Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: March 25, 2026
Waypoints
Start point
Train Station
Get Directions
780 m
Highlight • Castle
Translated by Google •
Tip by
1.36 km
Highlight • Monument
Translated by Google •
Tip by
1.44 km
Highlight • Religious Site
Translated by Google •
Tip by
1.70 km
Highlight • Castle
Translated by Google •
Tip by
5.49 km
Highlight • Natural Monument
11.4 km
Highlight • Natural Monument
11.8 km
Highlight • Trail
20.3 km
Highlight • Bridge
32.1 km
End point
Train Station
Way Types & Surfaces
Way Types
11.6 km
8.47 km
7.21 km
4.31 km
207 m
138 m
Surfaces
11.5 km
10.2 km
5.93 km
2.28 km
1.63 km
479 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (130 m)
Lowest point (60 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Monday 25 May
29°C
13°C
0 %
Additional weather tips
Max wind speed: 16.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.