Wolgast Peene Bridge – Wieck Hand-operated Drawbridge loop from Zinnowitz
Wolgast Peene Bridge – Wieck Hand-operated Drawbridge loop from Zinnowitz
4.6
(20)
265
riders
04:08
97.6km
300m
Road cycling
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: September 10, 2026
Tips
Includes movable bridges
Check opening times.
After 10.0 km for 47 m
After 37.0 km for 26 m
After 85.1 km for 47 m
Waypoints
Start point
Train Station
9.74 km
Highlight • Bridge
Translated by Google •
Tip by
10.2 km
Viewpoint
Viewpoint
34.7 km
Highlight • Viewpoint
Translated by Google •
Tip by
37.0 km
Highlight • Bridge
Translated by Google •
Tip by
37.2 km
Highlight (Segment) • Trail
Translated by Google •
Tip by
45.9 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
52.3 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
58.4 km
Highlight • Beach
Translated by Google •
Tip by
64.4 km
Highlight • Cycleway
Translated by Google •
Tip by
81.8 km
Tannenkamp
Forest
97.6 km
End point
Train Station
Way Types & Surfaces
Way Types
42.2 km
34.8 km
12.1 km
5.89 km
2.35 km
302 m
< 100 m
< 100 m
Surfaces
80.6 km
6.71 km
5.50 km
4.76 km
180 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Monday 12 October
14°C
1°C
18 %
Additional weather tips
Max wind speed: 25.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.