Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Login or Signup

Routes
Bike touring routes & trails
United States
Massachusetts
Middlesex County
Maynard

Eldridge Pond – Assabet River Dam loop from Crow Island Airpark

Routes
Bike touring routes & trails
United States
Massachusetts
Middlesex County
Maynard

Eldridge Pond – Assabet River Dam loop from Crow Island Airpark

Moderate

4.7

(6459)

8,681

riders

Eldridge Pond – Assabet River Dam loop from Crow Island Airpark

02:26

40.0km

310m

Cycling

Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is right next to a parking lot.

Last updated: May 18, 2026

Tips

Includes a segment in which cycling is not permitted

After 22.0 km for 82 m

Waypoints

A

Start point

Parking

Get Directions

903 m

Thanksgiving Pond

Lake

2

3.11 km

Assabet River Rail Trail

Highlight (Segment) • Cycleway

The Assabet River Rail Trail is a cool 8.6-mile, asphalt-surfaced trail that connects the five old mill towns of Marlborough, Hudson, Stow, Maynard, and Acton. A further four or so miles are planned to be added to this scenic trail.

Tip by

3

4.11 km

4

5.55 km

Mill Pond

Highlight • Lake

There is a footbridge that crosses over Mill Pond and offers views from both sides of the bridge. The reservoir is sometimes referred to as Fort Pond Brook Reservoir because …

Tip by

5

5.56 km

Mill Pond Footbridge and View

Highlight • Bridge

There is a footbridge that crosses over Mill Pond and offers views from both sides of the bridge. The reservoir is sometimes referred to as Fort Pond Brook Reservoir because …

Tip by

6

16.5 km

Eldridge Pond

Highlight • Lake

This little gem of a location is nestled just between the two small water features of Eldridge Pond and Frog Pond. The views out over the tree-lined shores of both …

Tip by

18.4 km

Mayerson Conservation Restriction

Nature Reserve

22.1 km

Smith Conservation Land

Nature Reserve

9

39.5 km

Assabet River Dam

Highlight • Structure

The Assabet is a "working river" and observed from above, it seems to be stapled to the landscape by bridges.

Over its 31-mile route, more than 40 bridges span it.

Tip by

B

40.0 km

End point

Parking

Loading

Way Types & Surfaces

Way Types

16.8 km

15.4 km

7.65 km

206 m

Surfaces

29.0 km

10.9 km

118 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (170 m)

Lowest point (50 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Friday 22 May

19°C

7°C

0 %

Additional weather tips

Max wind speed: 11.0 km/h

to get more detailed weather forecasts along your route

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Nearby routes

Moderate

4.6

343

Charles River Greenway Loop

02:16h

37.6km

70m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy