Pila railroad station – Hydroelectric Power Plant on the Gwda loop from Piła Główna
Pila railroad station – Hydroelectric Power Plant on the Gwda loop from Piła Główna
27
riders
02:48
47.5km
160m
Gravel riding
Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: October 7, 2026
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
After 108 m for 1 m
After 47.4 km for 1 m
Waypoints
Start point
Train Station
118 m
Highlight • Monument
Translated by Google •
Tip by
7.02 km
Highlight • Cycleway
17.0 km
Highlight • Religious Site
36.8 km
Highlight • Historical Site
Translated by Google •
Tip by
43.5 km
Highlight • Monument
Translated by Google •
Tip by
45.9 km
Highlight • Historical Site
Translated by Google •
Tip by
46.5 km
Highlight • Monument
Translated by Google •
Tip by
47.3 km
Highlight • Rest Area
Translated by Google •
Tip by
47.5 km
End point
Train Station
Way Types & Surfaces
Way Types
19.8 km
12.4 km
9.98 km
3.89 km
1.37 km
< 100 m
Surfaces
19.3 km
16.7 km
5.63 km
4.33 km
1.53 km
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Monday 12 October
13°C
1°C
0 %
Additional weather tips
Max wind speed: 10.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.