Roman Bridge of Fervença – Bridge over the Nabão River loop from Tomar
Roman Bridge of Fervença – Bridge over the Nabão River loop from Tomar
5
riders
05:30
72.9km
1,210m
Mountain biking
Hard mountain bike ride. Very good fitness required. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 16, 2026
Tips
Cycling is not permitted along parts of this route
After 70.6 km for 55 m
After 71.3 km for 87 m
Waypoints
Start point
Train Station
Get Directions
5.45 km
Ponte do Casal do Alecrim
Archaeological Site
36.0 km
Highlight • Settlement
Translated by Google •
Tip by
62.0 km
Highlight • Bridge
Translated by Google •
Tip by
67.3 km
Highlight • Historical Site
70.6 km
Highlight • Bridge
71.1 km
Highlight • Settlement
71.3 km
Highlight • Religious Site
Translated by Google •
Tip by
71.3 km
Highlight • Monument
Tip by
71.7 km
Highlight • Forest
Translated by Google •
Tip by
72.9 km
End point
Train Station
Way Types & Surfaces
Way Types
37.9 km
17.9 km
12.5 km
3.54 km
806 m
250 m
Surfaces
28.9 km
19.0 km
13.8 km
9.90 km
759 m
529 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (350 m)
Lowest point (50 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Wednesday 20 May
34°C
12°C
0 %
Additional weather tips
Max wind speed: 17.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.